The Hotel Sturgis

Project

HVAC Re-design, Equipment Replacement & More

Date Completed

2019

Location

Sturgis, SD

More Information

  • Design Build
  • HVAC

Project Details

Rasmussen Mechanical was contracted to renovate a retail facility that was built in 1906 and convert it into a hotel. This required a complete HVAC re-design for the 22-room facility, as well as for the coffee shop and lobby. Old dilapidated equipment was removed and replaced with ultra-high efficiency equipment. We installed exhaust systems for bathrooms as well as venting for dryers. Design, sheet metal, HVAC, and ventilation services were all used during this project.

Safety practices played a BIG role in prevented injury on a job site that was dangerous at points due to the age of the building.

  • 6 months to complete
  • Went from 80% efficient equipment to 95+% efficient equipment
  • 0 incidents