Rasmussen Mechanical Services was the prime contractor and self-performed all HVAC, sheet metal, and mechanical piping work.
A new modulating air handling unit (AHU) was installed to deliver conditioned air for UNL’s new Instrument Shop and Control Room.
The project also included improving the boiler system for the Lincoln facility. This involved the demolition of a single deaerator and the installation of two 150,000 pph Industrial Steam Deaerators.
- Prime contractor responsible for multi-disciplined contractors.
- Installation and start-up of equipment.