Rasmussen Mechanical Services was contracted to install all the carbon steel steam piping as well as the copper glycol piping for the new brew house at Divots Brewery in Norfolk, NE.

The project also included installation of a Fulton boiler along with a blowdown separator, boiler feedwater tank, two condensate receivers and a Coldshot chiller. All gas train vents for the boiler, feedwater tank and blowdown separator were also installed.

Rasmussen Mechanical Services performed a CSD-1 safety check and burner tuning and combustion analysis following the boiler installation.