Chadron State College

Project

160 Ton Chiller Install

Location

Chadron, NE

More Information

  • HVAC

Project Details

Rasmussen Mechanical Services was contracted to remove and replace an existing chiller used for cafeteria cooling at Chadron State College. The existing chiller was removed and updated with a 160 Ton Carrier air cooled chiller.

There were 200,000 pounds of counterweight used on the crane to safely lift the chiller. All piping was performed in-house. The entire project was completed in 2 days.